Search This Blog

Showing posts with label metro. Show all posts
Showing posts with label metro. Show all posts

6 November 2018

€50m plan to link Paris stations as an ‘integrated hub’

Transport authority Île-de-France Mobilités has outlined a 10-point package running until 2024 to rehabilitate the urban realm around Nord and Est stations in Paris, as well as improving access between them.

The €50m programme is intended to enhance the walking routes between the two stations, which using existing streets are approximately 500 m apart. The authority points out that in total 800 000 passengers/day use the two stations, as well as Magenta station on RER Line E which is located beneath Paris-Nord. More than 200 000 passengers use the stations to interchange between different rail or metro services.

24 February 2017

EU promotes sustainable urban mobility by funding the extension of the Warsaw Metro

In line with the objectives of the Energy Union's low-emission mobility strategy, the EU is investing over €432 million from the Cohesion Fund in the extension of the Warsaw Metro.
The major project adopted for Warsaw will fund the extension of the Metro Line 2, linking the Eastern part of the city to the West. A total of six new metro stations will be constructed, three stations in each part of the city.
The project also foresees the construction of a technical terminal, the purchase of 13 new trains as well as preparatory works for further extension of the line. Works are expected to be completed by November 2019.
The Warsaw Metro currently consists of two lines. The first segment of Line 2 opened in 2015, with EU financial support.
For more information: click here.

13 January 2017

Thessaloniki Metro: TBMs are nearing the finishing line

Thessaloniki Metro’s TBMs (Tunnel Boring Machines) are expected to finish their underground journey by mid-February, John Milopoulos, Attiko Metro SA Chairman, said. “As we speak, the moles are digging the last part of the tunnel between Patrikios and Analipsi stations. Analipsi is the last station of the network. This was the most challenging and costly part of the project as we had to go as deep as 25-30 meters.”, he added.
In addition, the approval of the project plan of Venizelos station was co-signed by the mayor of Thessaloniki, the Ministry of Culture and Attiko Metro SA a week ago. In 2017, it is estimated that all stations are going to be completed apart from the stations of Aghia Sofia and Venizelos.
According to Mr. Milopoulos, there are going to be 3 more lines in the future; 2 to Evosmos-Menemeni and Neapoli-Stavroupoli and one extending from Kalamaria to the Airport.
For more information: click here.

6 June 2016

New driverless underground line reaches Barcelona airport

Good news for autonomous driving trains. Line 9 of Barcelona underground with 15 stations operates driverless from now on.

1 June 2016

The restart of Thessaloniki metro



The construction of Thessaloniki Metro has been a sore issue for years. After many delays a new period started a few days ago as the construction works restarted after four years. The Greek Minister MrSpirtzis in the presence of the General Secretary of Ministry Mr. Dedes and the President and the Managing Director of Attiko Metro Mr. Milopoulos and Mrs. Papadopoulou announced the beginning of the works and their completion by 2020.